Toronto Smart EV Charging Upgrade

Efficient, secure and scalable EV charging for large commercial parking facilities.

⚡ 100+ L2 Chargers
📍 5,500㎡ Underground Parking
🕒 Completed in 45 Days
✅ FCC & ETL Compliant

Get a Custom Project Plan

Project Background: Smart Charging Infrastructure Upgrade in Toronto Financial District

Bayview Commercial Centre, located in the heart of Toronto’s Financial District, sought to upgrade its massive 5,500 square meter underground parking facility. Facing a surge in EV adoption, the property management urgently needed a high-density, smart charging solution. The core challenge was safely deploying over 100 L2 wall-mounted chargers (HS102 model) while managing complex electrical capacity constraints.

Mr. Mark Chen, Director of Facility Operations at Bayview Commercial Centre, stated: “We required a system with dynamic load balancing that also met strict North American electrical codes to ensure reliable charging for our tenants and visitors. Your solution perfectly addressed our pain points.”

Underground EV charger installation

Underground EV charger installation

Our Solution: Smart Design, Safe Execution

⚙️ Dynamic Load Balancing

Intelligently distribute power according to real-time load to prevent loop overload and maximize energy efficiency.

🧠 Centralized Management

Unified background monitoring, remote control, time-sharing billing and energy consumption reports, support API docking.

🔌 Modular Installation

Modular cabling and wall-mounted deployment facilitate later expansion and maintenance, shortening the construction cycle.

Charger wiring and control boxes
Charger wiring and control boxes

Project Results

100+
Chargers Installed
90%
Parking Coverage
+35%
Energy Efficiency
45 Days
Completion Time
Row of chargers installed in parking lot
Row of chargers installed in parking lot
“We required a system with dynamic load balancing that met strict North American electrical codes. Your solution perfectly addressed our pain points.” — Mr. Mark Chen, Director of Facility Operations, Bayview Commercial Centre

Quality & Compliance You Can Trust

Certified by ETL, FCC and ISO9001 — ensuring reliability, safety and manufacturing excellence.

FAQ

For large-scale parking lot projects like this case, our standard delivery period is 45–60 working days, which includes site survey, customized solution design, equipment installation, and commissioning. The exact time will depend on the complexity of the on-site wiring.

All wiring and installation work strictly comply with local electrical codes and fire safety regulations. We use flame-retardant conduits, proper grounding, and conduct system-level insulation and overload protection tests before project handover.

Our smart backend platform enables real-time monitoring, fault alerts, and load balancing. Property managers can easily track energy usage and remotely control chargers through the management dashboard or mobile app.

Launch Your EV Charging station Project

From initial consultation to seamless installation, our expert team delivers custom EV charging solutions tailored to your business needs.

leave your message

We will send detailed technical info and quotation to you!

Send An Inquiry